![]() The offline A228 link will cause horrendous traffic issues at Pembury. Strategic transport links cannot be provided without destroying large areas of AONB. You say that road locations have regard to KCC minerals allocations but those allocations have not yet been approved. Introducing hard surfaces and dwellings on to the meadows and fields will increase the flood risk beyond any mitigation measures.Ħ. ![]() Flood storage areas and other mitigation strategies can be delivered without developer contributions from new housing. 4,000 new dwellings are not needed in this area and there is no evidence they are needed.ĥ. There is no requirement for more primary school places in the immediate locality.Ĥ. It also crosses a railway line that is at the bottom of a very deep cutting.ģ. The proposed secondary school site is next to an extremely busy road that is already very congested at school drop-off times. The provision of employment and retail provision within the settlement will be minimal and no compensation for the agricultural land and farming/equestrian employment lost if the development goes ahead.Ģ. Why are such a large number of properties proposed for this site when it could have been built along the A21 corridor whcih would have caused less impact and could have been supported through thransport links to paddock wood and tunbridge wells.Ĭomments on Policy STR/CA1 (The Strategy for Capel Parish) p.156īased on this document an incomplete and already unachievable Policy has been drawn up by a compromised Council.ġ. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
January 2023
Categories |